Method Statement For Air Conditioning Pipe Insulation Works

 Content:

1. Chiller water pipes.

2. Condensate water pipes.

3. Refrigerant pipes.

4. Air conditioning drain pipes.

5. Valves & fittings.

General:

Items: - The Method Statement For Air Conditioning Pipe Insulation Works

Aim:

The aim of works is to describe mechanical works associated with insulation of

Chiller pipe, A/C drain pipe & Refrigerant pipe (copper pipe) to ensure compliance

with contract requirements approved shop drawings, materials, specification and

quality control.


Post a Comment

1 Comments

  1. Great article! This method statement provides a clear and practical framework for executing air conditioning installation works, especially useful for MEP professionals and contractors. I appreciate the structured approach—from material delivery and storage to testing and commissioning. Including safety precautions and quality assurance steps really adds value. It would be helpful to see a future post on common site challenges during HVAC installation and how to troubleshoot them. Keep up the great work!