This Method Statement covers the installation of Sanitary, Vent and Storm drainage piping installation. This procedure is to define the method used to ensure that drainage and vent piping have been installed as per the contract requirement.
- Scope of works
- Personnel rules and responsibilities
- Construction procedures
- Conformance criteria
- Materials
- Plant and equipment
- Storage and handling
- Health and safety
- Environmental requirements
- References
- Attachment
- Specification of underground drainage piping installation

0 Comments